How To Apply For Power From KPLC For Your New Home

In the past, getting an electricity connection in Kenya had a fair share of challenges. Only a few Kenyans had the privilege of having electricity from Kenya power connected to their homes. Nowadays, getting a house connected to electricity is very easy.
Whether you are renting, switching, or moving into your first own home, it’s never a bad idea to have KPLC sort electricity first before moving in. This way, you can enjoy the full glory of your new home.
From watching television non-stop, baking, cooking, and washing clothes to listening to music, power is essential. So what’s the procedure on how to apply for an electricity connection in Kenya?
Related Content: Cost Of Electricity Per Unit In Kenya Compared To Other Countries
Requirements for KPLC Electricity Connection
- Copy of National Identification (I.D) or Passport for Non-Kenyans/ Company Registration Certificates.
- Copy of your PIN Certificate.
- Route sketch map leading to premises where supply is required.
- Copy of title deed and land search documents for ownership of property (to support wayleaves consent).
- Duly filled Supply Contract form.
- Wiring Certificates (Submit any time after issuance of application reference number but before construction of the electricity network).
Applying for connection in-person
For offline applications, the application is divided into four stages as follows
- Make the Application
Go to the nearest Kenya Power and Lighting Company Ltd (KPLC) office near you or to a Huduma center to make the application. If you are making an application from the Huduma Center, visit the KPLC desk to make the application.
You will also be given a Supply Contract to fill out and sign.
- KPLC inspection
After your application is approved, KPLC will have some of its personnel visit your residence to verify compliance with standards. The officers will also estimate the amount you will be required to pay for the connection.
This phase will be done around eight days from the time your application was verified.
- Paying the estimate
Depending on the quoted costs, you will be required to proceed with payments where you will be issued with a receipt. The receipt should be taken to KPLC offices as soon as possible to avoid delayed installation
- Power connection
External works, meter installation, and other essential processes will be done to make sure you can access electricity. This will usually occur within 32 days from the completion of stage 3.
Online Application
Here you will need the following:
- An active Internet connection
- A laptop/desktop
- A browser
- Basic computer skills
- Contact details such as email and phone number
- Physical dress information
- Supply address (County, constituency, location, street, house name, and landmark)
- LRN or plot number
- You will also need the following in softcopy format, Ownership documents, Writing certificates, and National ID
Follow the procedure below to make an online hassle-free application:
- Connect to the internet: Whether it is through a LAN cable, Bluetooth, or even Wi-Fi, make sure that you can access the web before moving to the next step.
- Open your browser: You can do so by double-clicking on its icon. Alternatively, you can use the right-click and then hit the “Open” option in the right-click menu
- Go to the KPLC self-service portal: Key in the KPLC self-service address on the search bar of your browser. Wait for the website to load fully before moving to step 4.
- Choose the “new supply application” option: This is visible on the right side of your screen
- Fill in all the required information: You will be required to provide your details such as name and email.
- Attach the required documents: Attach the softcopy format authenticates listed above.
- Accept terms and conditions: Tick the button just below the application form and hit the “send” button.
- Successful application: If KPLC receives and approves your documents, an email with details of their personnel’s visit will be sent to your email. Stages 2, 3, and 4 will be repeated from the above procedure.
Related Content: Kenya Has The Highest Electricity Tariffs In East Africa
- January 2026 (220)
- February 2026 (246)
- March 2026 (286)
- April 2026 (202)
- January 2025 (119)
- February 2025 (191)
- March 2025 (212)
- April 2025 (193)
- May 2025 (161)
- June 2025 (157)
- July 2025 (227)
- August 2025 (211)
- September 2025 (270)
- October 2025 (297)
- November 2025 (230)
- December 2025 (219)
- January 2024 (238)
- February 2024 (227)
- March 2024 (190)
- April 2024 (133)
- May 2024 (157)
- June 2024 (145)
- July 2024 (136)
- August 2024 (154)
- September 2024 (212)
- October 2024 (255)
- November 2024 (196)
- December 2024 (143)
- January 2023 (182)
- February 2023 (203)
- March 2023 (322)
- April 2023 (297)
- May 2023 (267)
- June 2023 (214)
- July 2023 (212)
- August 2023 (257)
- September 2023 (237)
- October 2023 (264)
- November 2023 (286)
- December 2023 (177)
- January 2022 (293)
- February 2022 (329)
- March 2022 (358)
- April 2022 (292)
- May 2022 (271)
- June 2022 (232)
- July 2022 (278)
- August 2022 (253)
- September 2022 (246)
- October 2022 (196)
- November 2022 (232)
- December 2022 (167)
- January 2021 (182)
- February 2021 (227)
- March 2021 (325)
- April 2021 (259)
- May 2021 (285)
- June 2021 (272)
- July 2021 (277)
- August 2021 (232)
- September 2021 (271)
- October 2021 (304)
- November 2021 (364)
- December 2021 (249)
- January 2020 (272)
- February 2020 (310)
- March 2020 (390)
- April 2020 (321)
- May 2020 (335)
- June 2020 (327)
- July 2020 (333)
- August 2020 (276)
- September 2020 (214)
- October 2020 (233)
- November 2020 (242)
- December 2020 (187)
- January 2019 (251)
- February 2019 (215)
- March 2019 (283)
- April 2019 (254)
- May 2019 (269)
- June 2019 (249)
- July 2019 (335)
- August 2019 (293)
- September 2019 (306)
- October 2019 (313)
- November 2019 (362)
- December 2019 (318)
- January 2018 (291)
- February 2018 (213)
- March 2018 (275)
- April 2018 (223)
- May 2018 (235)
- June 2018 (176)
- July 2018 (256)
- August 2018 (247)
- September 2018 (255)
- October 2018 (282)
- November 2018 (282)
- December 2018 (184)
- January 2017 (183)
- February 2017 (194)
- March 2017 (207)
- April 2017 (104)
- May 2017 (169)
- June 2017 (205)
- July 2017 (189)
- August 2017 (195)
- September 2017 (186)
- October 2017 (235)
- November 2017 (253)
- December 2017 (266)
- January 2016 (164)
- February 2016 (165)
- March 2016 (189)
- April 2016 (143)
- May 2016 (245)
- June 2016 (182)
- July 2016 (271)
- August 2016 (247)
- September 2016 (233)
- October 2016 (191)
- November 2016 (243)
- December 2016 (153)
- January 2015 (1)
- February 2015 (4)
- March 2015 (164)
- April 2015 (107)
- May 2015 (116)
- June 2015 (119)
- July 2015 (145)
- August 2015 (157)
- September 2015 (186)
- October 2015 (169)
- November 2015 (173)
- December 2015 (205)
- March 2014 (2)
- March 2013 (10)
- June 2013 (1)
- March 2012 (7)
- April 2012 (15)
- May 2012 (1)
- July 2012 (1)
- August 2012 (4)
- October 2012 (2)
- November 2012 (2)
- December 2012 (1)